Installation costs of the heat pump and additional work in the old building

22.10.2026
What are the hidden costs of installing a heat pump in an old house? Learn about system flushing, wiring and other works that increase the final costs.
Installation costs of the heat pump and additional work in the old building

In the old building, the initial costs of the heat pump are determined not only by the installation itself, but also by the existing heating system and the adaptation needs of the building. Heat pumps: for example, it may be necessary to rinse the old heating system, install a separate electrical wiring line or adjust the connection of the equipment. Therefore, the initial estimate and the final cost may vary.

It is understandable to want to know the total investment already before the work begins. In this article, you will find out which type of heat pump can be suitable for an existing building, which is usually included in standard installation and what additional works can increase initial costs. Let's also see how insulation of the building and the specific features of the heating system influence choice to understand where the equipment can be connected to the existing solution and where further adjustments may be necessary.

Which heat pump is suitable for an existing building?

The choice is determined by the building's heat load, existing heating system and heated area. Before selecting the equipment, it must be assessed whether the existing heat distribution surfaces will be able to provide sufficient heat in the premises.

Appropriateness of radiators and heat distribution surfaces

The temperature of the required heating forward is determined by the suitability of the radiators for the heat pump. On a cold day when the outdoors are below -15 °C, the heating forward can be set to 50 °C and watch if the rooms keep a comfortable temperature. If the heat is not sufficient, radiators may have to be adjusted or the heat insulation of the building improved. The heated floors have a large heat distribution surface, so they are an important consideration when choosing the system solution. It is important to evaluate the entire heating, not just one radiator.

Eligibility for Latvian climate

The suitability of the heat pump for the climate depends on whether the plant is capable of operating efficiently in cold weather. Therefore, the heat load of the building and how the plant will operate in cold weather should be taken into account. The air-water system can be combined with another heating mode to supplement the heat production when the outdoor temperature does not exceed -15 °C. An existing boiler in the pellet can play an additional role in this solution.

The area of the building helps to narrow the choice, but does not replace the calculation of the heat load. Air-air heat pumps are indicated as suitable for 45 to 60 m2 areas, but air-water solutions, for premises up to 120 m2. Land heat pumps are indicated as the most suitable for buildings from 100 m2. These boundaries are the land-use choice criteria, not the only criteria. Air-to-water heat pump equipment use existing water heating distribution.

The cost of operation and payback time also depend on previous heating. In comparison, take into account the previous consumption, insulation of the building and the efficiency of the selected equipment.

Installation of heat pump in an old building: a reasonable investment?

The investment in the old building is also influenced by the condition of the existing heating system and heat distribution. Before planning your work, collect data on the building's surface, heat load, insulation condition and heating system.

Connecting the heat pump to existing heating

Combined heating uses a heat pump together with a heat source already in the building. This solution allows to maintain the existing system and use it for additional heat. The type of boiler, the distribution of radiator or floor heating, the condition of the pipelines and the control possibilities. The efficiency of the heat pump in an existing building is influenced by the heating outermost temperature and insulation of the building.

The need for replacement heating

The replacement heating is an additional source of heat operating alongside the heat pump. Its need depends on the heat loss of the building, the existing equipment and the heating temperature. The air-water heat pump can be combined with another type of heating to supplement the heat production when the outdoor temperature does not exceed -15 °C. The existing boiler can serve as a replacement source, but its operation must be coordinated with the heat pump management.

The choice is also influenced by the use of the building and the consumption of hot water. Collect heat consumption, winter room temperature, radiator performance and information about the previous heating system. This data helps to compare solutions and understand whether only a reconstruction or an additional heat source is needed.

The heat pump system can provide heating and cooling. Cooling possibilities depend on the equipment and how the heat is distributed, so in an old building, we have to assess how to connect the system to the existing heating. Radiators and warm floor heat are divided differently.

The cost of maintenance, repair and spare parts is the regular maintenance, damage diagnostics, repair and necessary parts. The final amount is determined by the type of heat pump, the nature of the damage and the necessary parts, therefore it is calculated by evaluating the amount of the work in question.

When changing heating solution of a building to a heat pump, consider insulation and ventilation with recuperation. Before installing, specialists evaluate the building's specific characteristics and calculate the most appropriate heat pump capacity. If the works are planned in winter, air-water heat pump installation must be arranged so that the heating system is disabled for the shortest possible time.

Air-water heat pump investment of € 7000 usually pays off in 7-9 years. These indicators help to compare the possible costs initially, but the most suitable solution is chosen taking into account the specific characteristics of the building and heating needs.

Work included in standard installation and additional work

The standard assembly usually includes the delivery, installation, connection and necessary consumables of the equipment. The original estimate may change in the old building if further adjustments are required.

The costs of design, coordination and authorisation in Latvia depend on the solution and the amount of work planned.

Additional electrical installation works

Additional wiring may include the installation of a separate line or an automatic switch on the switch. These works increase the final amount if the existing connection does not meet the requirements of the installation.

For example, a longer air-air track may require additional installation works. If the track exceeds 3 m, its construction may become a separate position. Also, the replacement of the partition is not automatically included in the standard assembly. It is useful to compare the estimated positions: line, protection machine, cables and connection before starting the work.

Design, harmonisation and authorisation

The design shall determine the location of the installation, the connection and the need for the connection of the building in question. The costs shall depend on the construction, the selected heat pump and the planned conversion works, and shall be indicated separately in the estimate according to the volume of the work.

No permits and reconciliations are required for all solutions in the same way. The document size may be influenced by, for example, the location of the outdoor installation and ground works. The ground heat pump solution must take into account the construction of the well, but the location of the outdoor installation is essential for the air heat pump.

What includes installation and how the equipment works

Air-water heat pump delivers outdoor air heat to water heating system, but air-air unit directly heats the space. Ground heat pump uses ground heat. In each case, measure the standard installation volume according to actual connections and materials, and not just the name of the installation.

During cold weather, outdoor temperatures influence the operation of the air heat pump and electricity consumption. Therefore, compare the specified working conditions, the planned location of the equipment and possible additional works.

Slēptās izmaksas uzstādot siltumsūkni

Initial costs for the purchase and installation of the heat pump

The initial amount is made up of equipment, delivery, assembly, connection and consumables. In the old building, it can be increased by adjustments such as the installation of a separate electricity line or the reconstruction of a heating system. To spot hidden costs in time, when installing a heat pump, compare the full amount of work, not just the price of the equipment.

When comparing offers, check that the estimate shows separately the equipment, delivery, installation, connections, materials and the work of masters. Offers with similar equipment may differ if the necessary adjustments are included in one, but in the other they are calculated in addition. The volume of works is also influenced by the installation's location, pipeline route and distribution position.

The cost of building a ground collector or borehole is determined by the solution, ground conditions, well depth and access to the work site. drilling solution is related to the production of heat from the ground.

The conditions of the aid may vary, so before budget planning, check the costs covered by the programme.

The amount of aid also depends on the type and capacity of the heat pump, which relates to the purchase of the plant and not the full installation estimate.

Compare the total investment after aid, electricity consumption and potential savings.The aid reduces the initial costs of the plant, but does not cover the costs of construction, assembly or additional wiring.

Therefore, when comparing offers, assess whether they include only the equipment or the works and delivery.

The company points out that the total heat pump estimate includes equipment, delivery, installation, connection, consumables and the price of the master services. This list of items helps to understand what constitutes the total amount and to see if the required work is separated.

Commodus: Air-to-water heat pumps

Commodus helps to assess whether the air-water heat pump is suitable for the heating system of an existing building and what adjustments can affect the volume of work.

The product cycle includes consultations, design, installation and maintenance of equipment. This helps to understand the work required for both the selected equipment and its installation before making a decision on the investment.

Contact Commodus to discuss a suitable heat pump solution for your building.

Plan the next step wisely

A good start is a clear idea of the needs of the house: which rooms you need to heat, how you use heating and what comfort you want to achieve on a daily basis. These answers in the conversation help you to focus on practical issues, not just the name of the equipment. They also allow you to discuss possible adjustments in a timely manner and to create an estimate of understandable work.

If you still compare solutions, Commodus offers air-water, air-air-air and ground heat pumps. By discussing the features of the building and the purpose of heating, you can assess which type of equipment meets your expectations. Thus, the hidden cost of installing a heat pump becomes a specific planning conversation, not an unexpected surprise.

Talk to Commodus about your heat pump and take the next step to a well-considered solution for your house.

Frequently Asked Questions

How and why to choose a heat pump?

Choose the equipment according to the building's heat load, existing heating and daily needs. First, determine whether all the house or separate rooms should be heated and whether the system should also prepare hot water. For example, in a house with water radiators, consider air-water or ground heat pump, while separate rooms can be heated with air-air solution.

How much do such equipment cost?

The cost of purchasing the heat pump depends on the type of equipment, the required capacity and the equipment. Air-water, air-air and ground heat pumps differ in the requirements for connection and installation. When comparing offers, assess whether only the equipment or delivery, tank and necessary materials are indicated.

What should we consider?

Note that the choice of the equipment affects both its location and the connection solution. For example, the outdoor installation must provide a suitable location, but the interiors must assess the layout of the pipes and controls. Before starting work, compare the estimates positions and make sure that the required materials, electricity connection and the adjustment of the heating system are included in the volume of the work.

How fast does the heat pump pay off?

The refund depends on the previous type of heating, the heat consumption of the building and the efficiency of the heat pump in the particular circumstances. If the house has been used for direct electric heating, compare its consumption with the anticipated heat pump consumption. Also include the cost of installation and adaptation of the building, not only the price of the equipment.

What are the total costs of installing a heat pump in Latvia?

The total amount of installation is made up of the installation and the necessary works for the building. This means that you can compare the installation, delivery, assembly, connection and consumables of the installation separately. The ground heat pump solution should also take into account the construction of the ground heat extraction system, while the air-water system may need a hot water tank. For comparison, use the full amount of work and not just the installation position.

What additional costs do air-water heat pump install?

Additional works may be necessary due to the condition of the existing heating system or the selected assembly. For example, the old pipe system may need to be rinsed, but a separate line and an autolocked switch may be installed in the compartment. For hot water preparation, an appropriate tank may be required.

Frequently Asked Questions

How much does the construction of a ground collector or borehole cost for a heat pump?

The costs are determined by the chosen solution, ground conditions, well depth and access to the work site.

How much does the increase in the power of the home electrical installation or connection cost for the heat pump?

The installation of a separate wiring line or an automatic switch on the switch can increase the final amount if the existing connection does not meet the requirements of the machine.