Wood and pellets
Add a heat pump to a wood or pellet boiler. Existing heating can provide extra heat on the coldest days.
Add a heat pump alongside your existing boiler or choose a modern pellet boiler — with EKII support.
↓
CTC EcoAir 700M / R290
A hybrid system lets you keep the current boiler and add a new heat source. Replacement and supplementation are separate supported activities.
Add a heat pump to a wood or pellet boiler. Existing heating can provide extra heat on the coldest days.
The hybrid-system activity also covers supplementing boilers using fossil energy sources.
An old wood or pellet boiler can be replaced with a new pellet boiler that meets programme requirements.
Support is the lower amount: 70% or 85% of eligible costs, or the cap defined in Annex 1.
| Output | Ground–water | Air–water | Pellet boiler |
|---|---|---|---|
| <10 kW | 5 700 € | 3 700 € | 2 300 € |
| 10–<20 kW | 7 700 € | 4 700 € | 2 700 € |
| 20–<30 kW | 10 000 € | 4 700 € | 3 000 € |
| 30–<40 kW | 11 400 € | 4 700 € | 3 200 € |
| 40+ kW | 13 000 € | 4 700 € | 3 400 € |
For an air–water heat pump from 10 kW with €10,000 eligible purchase costs, the cap is €4,700. That limits both the 70% and 85% calculation.

R290 refrigerant, variable output, heating and hot water without a ground loop.
CTC →
Compare the total project cost after support, including the ground loop and operating costs.
CTC →Automated pellet heating with cleaning, ash removal and remote monitoring.
RTB →Air–water and ground–water solutions work with a hydronic heating system. Heat loss, radiator capacity and required water temperature should be assessed.
A room stove is not a central-heating boiler. The replacement/supplement activity requires a qualifying existing appliance.
Eligibility depends on building classification, ownership, independent engineering systems and approvals.
Installation and all heating-system alteration costs cannot automatically be counted as equipment purchase. Eligible and other costs should be separated in the quote.
Collect the existing boiler data and fuel consumption. Request a quote that separately shows equipment output, works, possible support and your own contribution.
EKII ↗* Informative estimate. Support is capped by the applicable maximum limits. Actual support is determined by the Environmental Investment Fund.
Comments